After taking a week's break from Venezia, and with many stupid mistakes that shall not be repeated, I have finally started the first sleeve! I decided to save my sanity and not P2tog the hem, but will slow it down when I am finished knitting. There isn't much to see yet, but it will look better in the next photo.
I have been working mostly on Rusted Root this week. I have finished the ribbing on the neck and the sleeves, and only have the rest of the body to finish. I think I have three repeats to finish until the bottom ribbing, and I may have it done by the end of next weekend.
The Alpine Knit Scarf has once again, regrettably, been sent to the Frog Pond. Not for any mistakes with the pattern, but because I hadn't touched it in two weeks, since we were waiting to see Pirates 3, and I needed the yarn for something better.
The Mystery Shall 3 was announced this week, which I signed up or, and the called for colors are either white or black. Midnight Heather Alpaca Cloud would be perfect. I went out and found beads, and bought a small enough hook. It can been seen here, since I accidentally deleted the picture and don't know how to re-upload it with out having to start the whole post over
Cast on is at the end of the month.
I have one other project that I am excited to start, but not ready to blog about yet. I think the photo will give a hint: The yarn has been in my stash for the last two years, since Cotton Ease was first discontinued, and I bought enough of a dye lot to make a sweater, which has been abandoned. I think I have enough yarn for my size, but I'm not 100% sure.
No comments:
Post a Comment