Here was my progress as of Monday night on my NaKniSweMo project. Please pardon the blechy bathroom mirror photo, it was late, and I was the only one up. Sleeves are done, and I am on the 15th repeat of 30 (or 40 if I have the yarn) repeats of the body pattern. Only 60 (or 100) rows of 189 stitches left! 11340 (or 18900) stitches left to knit! Totally doable. Well, plus the collar, but I'm working on that at lunch currently. I did decide to make the collar about half as wide as the pattern. This is mostly to make sure I have the yarn to knit it, reading Ravelry, this seems to be the major yarn suck of the pattern.
Finally a post on the weight loss progress. After months of saying I needed to get back on track, I finally re-signed up for Weight Watchers. I tried using a free site for months to count calories, but it never "clicked" for me, and I kept going over every day. Friday I noticed my weight had crept back up to the 230's and briefly hovered at the weight I was when I had Kaylee less than 2 years old. Not good. Not good at all. So far so good. I have found it easy to avoid the sweets and bread (except for two occasions where there was stress and all you can eat pizza, but I didn't go as overboard as I had in the past)
My first WI is Friday, and I will try to post the results then.
Showing posts with label Therapi. Show all posts
Showing posts with label Therapi. Show all posts
Wednesday, November 18, 2009
Friday, November 06, 2009
Sunday, November 01, 2009
Christmas Knitting in November
I've been busy the last few months getting a head start on some Christmas knitting, so I could "relax" in November and work on NaKniSweMo again this year. I started in March (yes March) with Aeolin for my mother-in-law, but that is still unblocked, and will probably remain so until closer to the holiday or the next time my parents have the kids overnight.
Other projects that I have knit are Ice Queen, for my mother. I knit this in about two weeks (off and on) using JeggerSpun Zepher in Juniper and light gold beads.

And pulled up over my head.

For my 15 year old Emo Brother-in-law, knit York. I'm going to embellish around the moth to make the sculls look more like the sculls from the Punisher, but I need to felt it a bit more still. I'm waiting until I have both sinks cleaned out and both kids asleep at the same time. I figure I have until Christmas to get this done, so that miracle is sure to happen sometime between now and then. I knit this in one day while home sick and watching a Buffy marathon.

I'm not sure who this one will be for, I might send it to my sister in Germany, or I might save it for myself. This is knit from my homespun Falkland that I knit during the Tour De Fleece this summer, and is nice and soft and crunchy.

In regular knitting, my Arisaig is coming along nicely. I have the back lace piece finished, and have started on the right lace piece. I'm still pretty confident that the changes I have put in to make this a pullover will work and look nice, but it is going to take a while to do. I am glad that this isn't what I decided on for NaKniSweMo.

But this is. Therapi. Knit in my own hand dyed yarn, using Wilton's Leaf Green (a whole container for seven skeins). I'm 38 rows into the yolk (have 30 more to go) before it is time to separate the sleeves and work on the endless 3X3 ribbing for the body. But I'm sure that I will be able to have this finished before November 30th.
Other projects that I have knit are Ice Queen, for my mother. I knit this in about two weeks (off and on) using JeggerSpun Zepher in Juniper and light gold beads.

And pulled up over my head.

For my 15 year old Emo Brother-in-law, knit York. I'm going to embellish around the moth to make the sculls look more like the sculls from the Punisher, but I need to felt it a bit more still. I'm waiting until I have both sinks cleaned out and both kids asleep at the same time. I figure I have until Christmas to get this done, so that miracle is sure to happen sometime between now and then. I knit this in one day while home sick and watching a Buffy marathon.

I'm not sure who this one will be for, I might send it to my sister in Germany, or I might save it for myself. This is knit from my homespun Falkland that I knit during the Tour De Fleece this summer, and is nice and soft and crunchy.

In regular knitting, my Arisaig is coming along nicely. I have the back lace piece finished, and have started on the right lace piece. I'm still pretty confident that the changes I have put in to make this a pullover will work and look nice, but it is going to take a while to do. I am glad that this isn't what I decided on for NaKniSweMo.

But this is. Therapi. Knit in my own hand dyed yarn, using Wilton's Leaf Green (a whole container for seven skeins). I'm 38 rows into the yolk (have 30 more to go) before it is time to separate the sleeves and work on the endless 3X3 ribbing for the body. But I'm sure that I will be able to have this finished before November 30th.
Monday, October 19, 2009
Pullover Fail
Saturday I started working on my modified Arisaig pullover. I decided I would try to knit the pull over in one piece, with a provisional cast on at the start of the lace and would split at the arms. After much adding, casting on, frogging, re-calculating, casting on again and fudging I had the cast on started. All 368 stitches. It only took one repeat of the 16 row chart for me to realize that I was fucking crazy. Yeah. I frogged again last night and am going to work the body in pieces, and will seam, and knit the ribbing in the round. Take two begins tonight with the back.
This weekend also had me dying the yarn for my NaKniSweMo project, Therapi. I wound up dying 7 skeins a nice bright leafy green, and realized that the green is the same shade as the school colors for the Uni that I work for and graduated from. Oh well, it is going to be the office sweater. I just hope I will have enough yarn.
I did finish the Chickidee Cowl and Ice Queen, and will try to get pics up as soon as I block them.
This weekend also had me dying the yarn for my NaKniSweMo project, Therapi. I wound up dying 7 skeins a nice bright leafy green, and realized that the green is the same shade as the school colors for the Uni that I work for and graduated from. Oh well, it is going to be the office sweater. I just hope I will have enough yarn.
I did finish the Chickidee Cowl and Ice Queen, and will try to get pics up as soon as I block them.
Subscribe to:
Posts (Atom)