Friday, August 31, 2007
I do still knit, right?
I've had two great knitting weekends in the last two weeks, and I plan on having a third one this weekend. Sure, I thought I would get the second sleeve of Venezia done this week, but thanks to a killer headache that has lasted most of the week, which lead to a 8 PM bedtime, I haven't done any knitting since Sunday, but I did get a lot done last weekend. Not only did I get to the halfway point of the second sleeve, about one repeat from the start of the steak, I finally sewed down the neck bands, the first sleeve band, and sewed the shoulder together. Then I couldn't find my size D crochet hook so I could reinforce the sleeve steak, so I couldn't cut that and sew the should in, but I will go hunt up a new one this weekend.
I haven't done any lace knitting in the last week, but will go back to the 2nd peacock as soon as I am done with Venezia, then I'll think of something to do with the rest of the massive ammounts of lace weight that I still have in stash.
Tuesday, August 21, 2007
Some Blog Cleanup
The Mystery shawl was going well, but I wasn't loving it. I think working on that was part of where my non-knitting has come from. I had to force myself to work on it, and when I saw the direction that clues 5-7 were taking, I was less than motivated. To make matters worse, I lost track of where I was in the pattern, and repeated a 10 row section 30 rows back from where I was. I tried tinking/frogging to that point, but wound up frogging the whole stole in a spray of black beads of doom.
Instead, I have been working on Venezia, thinking maybe I can get the sleeves done to get a FO picture done soon before my belly gets too huge. I kicked out the rest of the first sleeve in a weekend, and know started on the cuff of the second sleeve this weekend. I couldn't remember the mistakes that I made in the first cuff, so they won't match 100%, but I think with careful blocking, it shouldn't be too bad. I don't think I'm going to worry too much about getting the stripes on the sleeves to match up, I'm just going to go with what ever surprise the ball of yarn I pick gives me.
The second PFS does get some work, here and there, but not as much. Maybe its because I have already knit the shawl once that the mojo isn't really there, but I want to get this done so I can use the salvaged black yarn from the MSA to knit something for my twin for Christmas/birthday time.
I haven't had DH take any recent belly shots, but its there, somewhere under all the flab that is getting pushed up and out. Ugg. I told myself that I was going to be in better shape and thinner when I got pregnant again, but oh well. We had a good midwife appt last week. Finally got to hear the little stinker's heart beat. S/he was hiding under the pubic bone, and didn't want to be found.
The Fall semester is getting ready to start on Monday, so this is crunch time (and overtime season) at work, so there won't be much knitting going on.
My parents sold their house, and are signing the paper work today. And I am in a bit of a funk about that, but since they are both retired, there is no way they can afford the old house, and now they can move to the beach and be bums for the next few years.
Friday, August 10, 2007
The Pregnancy Blogging Blues.
I just haven't been knitting that much over the last few weeks.
DH and I have has some issues come up that are taking up all my brain function, and I have been spending hours in deep thoughts instead of with yarn and needles in my hand.
I am falling behind on my MS3 clues. The first 3 clues I had done before Sunday night. I was almost done with Clue 4 when C hit the needles out of my hand, while I was on a border section, and the lace laddered all the way down to the life line 50 rows back. I have done some work on it, but I'm only 1/2 done with clue 5, and clue 6 came out this morning.
The second PFS shawl gets maybe 4 or 5 rows worked on a week. That's it. I was hoping to have it finished this summer, but I don't' see that happening.
I have been working on a pair of socks. Monkey's in one of the yarns I picked up last month. I got the first sock done in 10 days, and have been working on the cuff of the second sock for just as long.
Venezia is still in hibernation. With us hitting the 100's here in Texas for the foreseeable future, it is going to be another few months before she will be picked up again, and knowing that I won't be able to wear her, or even try her on when she is done is a real downer.
In some ways this pregnancy is harder on me than when I was pregnant with C. Maybe its because I'm in my 30's now. Maybe its because it is a second pregnancy, but I was nauseous for most of the first trimester(even if I haven't thrown up), and have been so exhausted every day, that I come home from work and take a 20 minute nap while C is watching a cartoon off of the DVR.
I'll try to be a better blogger, Heck, I'll even try to remember to take photo's every once in a while.
Is it nap time yet?
Sunday, July 22, 2007
750 pages in 12 hours.
I took a few breaks, driving C over to my dad's for the afternoon, lunch with DH, picking up DS from my dads, but I was offically done with HP by 9:45 last night.
My head hurts, but today I have to keep C occupied so DH can read.
And knit.
Monday, July 16, 2007
Finally, an update.
Work goes on on the MS3 stole. I am almost done with clue #3, and so far, so good. I don't think this is going to wind up being too big, maybe a nice wide, short scarf size, but that cool. Depending on the actual theme, this might wind up being a birthday/Christmas gift for my sister.
Work is going slow and steady on the second Peacock Feathers shawl. I only work on it when I have the energy at night, after I am done with that week's MS3 clue. I am almost done with the third chart, and so far I haven't had the massive tinking and frogging issues I had with the first Peacock Feathers Shawl, knit last year. (What are the chances that I just jinxed myself, and will have to frog by the end of the month?)
I did some yarn shopping today at the Woolie Ewe in Plano. I picked up two skeins of Jojoland Kaleidoscope 100% Merino Wool. This colorway is very close to the results of my one experiment with Kool-Aid Dying, and I think they might become a pair of Monkeys.
I also gave into temptation and picked up a pair of Lorna Laces Shepherd Socks in Somerset. The pinks and greys kind of suit my mood these last few days.
So far, the pregnancy is going good. I'll be 10 weeks on Wednesday, and I have my first midwife's appointment that afternoon. Just for laughs, here is a belly shot. I bought a pair of maternity capris today, which is good since my one pair of jeans I could button suffered a horrible rip this weekend.
As usual, please pardon the messy, ugly bathroom and my fat gut.Monday, July 02, 2007
The Knitting Blues...
So Friday, came the first clue for the Mystery Stole 3, and I printed it off at work, and spent the next 9 hours looking at the charts (because I left my knitting stuff at home, silly me) and trying to guess what it would look like knitted up.
I cast on as soon as I got home from work, between snuggles from DS and all, and managed to get most of chart A done before bed time. I had a few struggles with putting the beads on, wondering what the heck I was thinking, getting beads that were smaller than the ones called for in the pattern, but they were the only ones the craft store had that were the right color that I wanted. Saturday I finished chart A, and started on chart B, when the perfect way to handle the beads, and not break my tiny hook, came to me. I started licking the yarn before I put the bead on. Not only did it make the beads slide on easier, but the yarn was less likely to split in the process. It went from taking me 5 minutes to put each bead on, with much yelling and screaming, to less than 1. I finished chart B last night, and with it, clue 1, and I realised that I missed knitting lace.
I haven't had a finished lace project since March, just two attempts at the Alpine Knit Scarf, that both wound up in the frog pond. I decided to break my one lace project at a time rule, and ran to the stash for a skein of the Knit Picks Alpaca Cloud in Tide Pool Heather that was waiting to be cast on for a second Peacock Feathers Shawl. The only problem was my favorite lace knitting needles were in use with the Mystery Stole 3, and my size 4 options were in use with Mommy Snug. But, I remembered something about the options, I could just put the Mommy Snug on hold, and "borrowed" the size 4 tips for the PFS2. So I did, and I cast on last night, and I feel the lace knitting groove starting back up.
Will I return to Mommy Snug before the bump is born next year? Will I finish the sleeves for Venezia? Who knows. But I will say, most likely not while it is Summer in Texas and way to hot to knit sweaters.
Sunday, June 24, 2007
FO: Rusted Root
Pattern: Rusted Root from Zepher Style
Yarn: Cotton Ease Sugar Plum, 4 skeins, has been in stash for 2 years.
Needles: Size 5 for body, 3 for ribbing
Size: Large
Cast on: May 2007, Cast off June 2007
Modifications: After 4 repeats I changed the leaf pattern to make both sides look neater. I left out the waist shaping on the body so I could maybe wear it for a month or so in pregnancy, not going to happen. Might go back and add another inch or two later on.
Its not a knit I see myself wearing out that much, maybe next spring and summer, but it was a popular pattern that I had stash yarn to knit.
There has been some knitting on other projects as well.
I'm about 60 rows in on the front of Mommy Snug. This has been my main week day knitting project this week, but I haven't done much knitting on it. There is something about rows and rows of 2X2 ribbing that drives one nuts.

I did get my new 16inch size 3 needles Thursday, and have done 2 repeats of the Venezia sleeve pattern since then. I think the longer stripes will work with the body, but I don't think I can get both sleeves to match up.
DH and I went and saw Spamalot Friday night for our anniversary, it was a riot, and not a complete rip off of Monty Python and the Holy Grail. My parents have had C since Friday, and they are due to drop him off any time now. While I loved having a child free day last night, I can't wait to have my little boy in my arms again.
Tuesday, June 19, 2007
Yes, I'm pregnant!
I haven't really felt much like knitting lately, but I've been getting a little done.
I finished Rusted Root, but I haven't got any photos yet. I need to "wash and block", but since it is knit in cotton ease, I figure running it through the washer and dryer will be good enough. I did modify the the pattern a bit by leaving out the waist shaping, that way I would be able to wear it a little bit this summer, but I don't know how long.
I have done a bit more on Venezia, but I had too many stitches to do DPN's right, and way too few to use my one size 3 circ needle (even with magic loop), so I'm waiting on a 16inch needle to come in from KP before I do much more. I have lost steam on this sweater knowing that I won't be able to wear it this winter,
I did start my Mommy Snug, from the Summer 06 Interweave Knits. I'm using more yarn from stash, Cotton Ease in Popsicle blue, and I am pretty close to gauge, but not 100%. I figure since it is a maternity sweater in ribbing, the extra bit of room won't be too bad. I cast on Sunday and have 50 rows done already, so this looks like it will be a faster knit than I thought it would be.
I'm still waiting for the start of the Mystery Stole 3 knit along, which will be next Friday. I need to get back in the lace mode. I haven't finished a lace project since April.
I'm also looking forward to Friday night when DH and I are going to see Spamalot. The tickets were our anniversary present to each other for 5 beautiful years together.
Sunday, June 10, 2007
Finally, a week for knititng.
After taking a week's break from Venezia, and with many stupid mistakes that shall not be repeated, I have finally started the first sleeve! I decided to save my sanity and not P2tog the hem, but will slow it down when I am finished knitting. There isn't much to see yet, but it will look better in the next photo.
I have been working mostly on Rusted Root this week. I have finished the ribbing on the neck and the sleeves, and only have the rest of the body to finish. I think I have three repeats to finish until the bottom ribbing, and I may have it done by the end of next weekend.
The Alpine Knit Scarf has once again, regrettably, been sent to the Frog Pond. Not for any mistakes with the pattern, but because I hadn't touched it in two weeks, since we were waiting to see Pirates 3, and I needed the yarn for something better.
The Mystery Shall 3 was announced this week, which I signed up or, and the called for colors are either white or black. Midnight Heather Alpaca Cloud would be perfect. I went out and found beads, and bought a small enough hook. It can been seen here, since I accidentally deleted the picture and don't know how to re-upload it with out having to start the whole post over
Cast on is at the end of the month.
I have one other project that I am excited to start, but not ready to blog about yet. I think the photo will give a hint: The yarn has been in my stash for the last two years, since Cotton Ease was first discontinued, and I bought enough of a dye lot to make a sweater, which has been abandoned. I think I have enough yarn for my size, but I'm not 100% sure.
Tuesday, June 05, 2007
Knitting under the influence.
I had to frog the first sleeve of Venezia twice, and many times over on the color work.
I missed 10 stitches when I cast on, and it really threw off the color work.
Venezia is in time out for the rest of the week.
Rusted Root has come out to play this week, with a little bit of Alpine Lace, but I really haven't done much knitting this week.
I have been working on setting up my Ravelry account and reading the new Anita Blake book.
Did I mention I now have a Ravelry account? Its so cool!
Wednesday, May 30, 2007
Body Works.
C was most excited to watch me cut the steeks this afternoon, and I think he likes the finished product.
I like it too. I "tried" it on the best I could without having the shoulders seamed, and it fits! Most susprising, I think the neck mod looks real close to Eunny's last teaser sweater, but I can't be certain until I have this bad girl finished and blocked.
I am going to finish the neckline like the pattern says, with the short-row shaping, but I need to wait for payday to get a size one circ needle, and if I can't find one in town, that means placing a KP order.Until then, I've started on sleeve island, trying to fit the cuff on my size 1 DPN's.
Saturday, May 26, 2007
Black Lace and a Dark Movie Theatre Don't Mix.
DH had other plans, and we went from work to Wendy's and straight to the Cinamark.
He had the Harry Potter books with him on his PDA to read, and he told me to go ahead and knit something.
The only thing I had with me was the Alpine Knit Scarf, which is on size 2 needles, in black lace weight. While we were standing outside the theater in the light, it was fine to knit, and I got a good 3 rows done. After we were seated, it was a different matter. They had the lights turned to the almost off, and hadn't started playing the onscreen pre-movie adds that theatres play now.
I managed to wedge myself in the seat so I at least had the white screen as in front of me without holding my knitting up to my eye level at all times, and got another two rows knit.
The movie ROCKED! Both DH and I left the theatre saying we HAD to go back and see it again after we got paid, (Or Monday and put it on the CC, and its been a long time since we felt that way after seeing a movie.
I'm still podding away on all three knits, and looking ahead to what is next.
Next lace will be the Peacock Feathers Shawl, again, but this time for me, in KP's Alpaca Cloud Tide pool, but I need to finish both The Alpine Knit Scarf and Venezia, since I currently have my size 3 cir busy with that.
Next Fair Isle will be the Bauhaus Fair Isle from the Spring 2007 IWK (Unless Eunny publishes another amazing pattern before then). I've been looking at Subs, and I think Knit Picks Telemark will work best, but it leaves me pondering. If KP Telemark is a sport weight yarn at 103 Yards per 50 grams, why does KP WOTA, a worsted weight have 110 yards? But it looks like the Telemark knits up to the same gauge as the called for Heilo, at $3 less per skein.
Next "Anytime" sweater will either be Wicked or maybe Saharah or the Simple Knitted Bodice, or any of a thousand projects that will come across my eyes between now and then.
*ETA*- Black Lace, Work, surfing Bloglines while knitting the row where the pattern changes don't mix either. I lost count completely after I read about Glampyre's good news. Since I don't have a Word Press Account, and can't commit on her blog, I wanted to say CONGRATS! here.
Thursday, May 24, 2007
Now with Photos!
I am not happy with how the hem keeps flipping up, and if it doesn't block out flat, I am going to rip it out and re-knit on size 1 needles, after I buy them.I did another 3/4s of a repeat before I decided to modify the neck. I put the center 60 stitches on waste yarn, and grafted out a gradual scoop.
I'm thinking I will have the body done by next Thursday (if not earlier), and will start on sleeve island in June.
I also started Rusted Root on Sunday. I have about 20 rows before I separated the sleeves, but I am running out of room on my needles already. So far the pattern is easy, but I am wishing that I had used the Rose Leaf charts from the AKS since the lace charts are written odd. 
Tomorrow DH and I are taking off early to see Pirates and do lunch.
Today is the anniversary of the day we first saw our house. If we had to chose again, I don't know if I would pick this house again, but right now, it is home.
FO: Leaf
Pattern: Leaf by Stephanie Japel
Depending on the dress I get to wear on our anniversary, this one might actually get worn once. or twice.
Tuesday, May 22, 2007
I've Been a Bad Blogger Lately.
Since I broke the screen on my laptop, and have to use a monitor screen, its just not as easy to get on the computer at home, and now I find that C has taken the cable that allows me to download photos and hid it somewhere.
Saturday I did a lot of knitting on Venezia. I started the arm steeks, and am almost done doing the decrees rows there, then I have 48 rows without any increases or decreases before I start the neck. I think I might be able to have the body done in a few weeks.
Sunday I finished Leaf while watching the Ninja Warrior marathon on G4. I do have some cruddy bathroom photos to post as soon as I can. I sucked it up and did the i-cord edging around the body, and except for a few spots where I missed a pick up stitch, it looks pretty decent.
I then cast on for Rusted Root in some old Cotton Ease that has been in the stash for 2 years. While I love how the knitted fabric feels, I forgot what a number the cotton ease can do on your hands. I think this is going to be a slow knit for the most part, but that's ok with me.
C has been sick all weekend, I stayed home with him yesterday, and DH is home with him today. Since C has gotten worse last night/this morning, DH is taking him in to the Doc's in about an hour.
I finally got a chance to look through the Summer Interweave Knits, and it just reaffirmed that this is one issue I won't be buying. The few things that looked like I might knit didn't look as good to me in print.
Wednesday, May 16, 2007
Artistic Licence.
I started the i-cord edging on Monday night after finishing the first sleeve, and got a few inches in before deciding that the I-cord was coming out way to thick, about the size of my thumbs.
Ok, So I frog it all out, and re-start on size 4 DPN's, about two sizes smaller. The i-cord is still a bit thick, but it looks better, and it takes me a little over an hour to get to the 11 inches called for before starting the attached i-cord.
The directions state Now work applied i-cord around neckline as foll: *k4 on DPN, then knit last st tog with 1 st picked up from right front neck edge—5 sts. Slide sts back to working end of needle and rep from *.
I got two inches in and decided it looked like crap. Frog back, and try again, still looking like crap and I've been attaching to the left side.
Frog again, attach to the right side this time, but still looking like ass.
Third time's the Frog. Decided to just knit the i-cord solo and sew on. Work on the i-cord for another half hour this morning hating every inch of the lumpy tubular thing that was coming off of my needles, thinking there must be something easier.
Like crocheting the ties and the edging.
Frog for the forth time, look through drawers to find an appropriate crochet hook, modify the leaf so I start with three stitches, and start whipping out a chain. Had the 11 inches done in 60 seconds flat. Started attaching to the body (from the left, because I am feeling rebellious) and get halfway done with the front before I remember that today is a work day, and I do need to get dressed and get C up and moving.
I think I will be done with the i-cord this evening, and then all I have left is the last sleeve and seaming.
Sunday, May 13, 2007
Happy Mothers Day
My Mothers day present was a day to myself yesterday, of which I spent a large chunk of time knitting on Leaf.
The body is finished, and I am working away on the Sleeves. I think it might be possible to have a FO on this by the end of next weekend.I did some knitting on Venezia today while we were at my mothers.
I am about half way done with the fourth chart repeat, and about 23 rows away from starting the steeks for the arms, again, I am thinking by next weekend.
I did break my "No more than two at a time" rule and re-cast on for the Alpine Lace Scarf last night. This time I am working on the size 2 Knit Pick options that I bought last month, and the P2tog's are going a lot smoother.
DH also bought me the pattern for Rusted Root, which I am planning on knitting with some Cotton Ease that has been in the stash for over two years, when I bought up tons at half price.
Wednesday, May 09, 2007
Computer problem fixed...
DH mentioned the problem with my laptop to his boss, and his boss gave him an old 17inch flat screen monitor that they had no use for other than collecting dust.
So, we got the monitor set up to the computer, same size screen as the lap top had, so no real change there. Now I have to type on the laptop, and turn my head to look at the screen. DH and I are thinking of hooking an external keyboard and mouse up as well, and just using my laptop as a CPU unit. But that would be silly looking, wouldn't it?
It was late by the time we got it hooked up last night, and I didn't' get any photos shot or uploaded, but I will try to do that tonight while cooking and DH takes C to the park (weather permitting).
What also made it late last night was the dogs both got out while C and I were going out front to wait on DH to get home with dinner. I set C down in our front yard and took chase, since both dogs were headed to the park. I cornered Ying, and got her back home, but Yang was across the street and running fast. I went in and grabbed the quick leash, since Yang can't seam to keep any collar on for more than 5 minutes. So, I grab the collar and C, and we head out the door running. A group of guys playing basketball in the park said that he took off running to the left. As I was looking that way, I saw DH driving up, so I flagged him down, put C in his car seat, and hopped in the passenger seat. We drove up and down the street calling his name and asking anyone we passed if they saw a orangish brown dog run by. Nothing. Its at this time that it sinks in just how close we are to Hwy 377 (Carroll) and that my baby could be hit by a car. C kept asking where Yang was, was he hiding in the leaves? on the roof? in that garage? After going the full length of the street DH decides to drive by our house to see if he showed up on his own, nothing, and we drive down the the cul-de-sac to turn around, and there we see him, running after the car. Thank god! I got out of the car and gave Yang a big hug, put the leash on him and walked him home. I'm so glad he is safe, but he gave me a major scare.
Monday, May 07, 2007
I'm an Idiot.
How did I break it? I forgot that I had a pen resting on the keyboard, and I went to close it, cracking the screen. DH thinks we can hook the laptop up to a monitor so I'm not completely without Internet action at home (he will not let me touch his laptop after this), but until then...
I didn't get much knitting done over the weekend either. I think I have done 20 rows on Venezia since last Monday. I am almost done with the third repeat of the chart, only 3 or 4 left to go, plus the sleeves.
Tuesday, May 01, 2007
Thank you all so much!
Now that I am done working on that, it is back to the much neglected Venezia.
I am a little over two pattern repeats in, and just joined the second ball of yarn for the background color yesterday. I know that I will have more than enough yarn for the entire sweater now.I do have a dilemma though. I know that I won't be able to get the bands of color to match from the sleeves to the body, and that doesn't bug me too much. I'm just trying to figure out which will be better.
I could just do the sleeves with the wider stripes and have them not match at the shoulder.
I could knit both sleeves as one big tub, incorporating a steak seam like in a cardigan, cut and sew.
I could knit both the body and two separate sleeves up to the steak, and join as one, and work the decreases as indicated in the pattern.
The first option sounds easiest to me, and I can always do that and if I decide I don't like it BEFORE I cut the steaks, I can frog back and do one of the other options.
I did cast on for another project Friday night to give me a break from stranded color work:
Its the Cropped Cardigan with Leaf Ties that Knitty.com has as an excerpt from Fitted Knits. This is the first top down sweater that I have attempted, and so far, it makes for great mindless knitting, with wonderful style. The yarn is mystery wool that I got off of Ebay two years ago when I discovered there was yarn other than Red Heart Super Saver. Its a bit scratchy, and smells a little, but I like how the color is ties in with the leaf theme.