Showing posts with label Rusted Root. Show all posts
Showing posts with label Rusted Root. Show all posts

Sunday, June 24, 2007

FO: Rusted Root

No photo of me wearing it, but I am done with Rusted Root!

Pattern: Rusted Root from Zepher Style

Yarn: Cotton Ease Sugar Plum, 4 skeins, has been in stash for 2 years.

Needles: Size 5 for body, 3 for ribbing

Size: Large

Cast on: May 2007, Cast off June 2007

Modifications: After 4 repeats I changed the leaf pattern to make both sides look neater. I left out the waist shaping on the body so I could maybe wear it for a month or so in pregnancy, not going to happen. Might go back and add another inch or two later on.

Its not a knit I see myself wearing out that much, maybe next spring and summer, but it was a popular pattern that I had stash yarn to knit.

There has been some knitting on other projects as well.


I'm about 60 rows in on the front of Mommy Snug. This has been my main week day knitting project this week, but I haven't done much knitting on it. There is something about rows and rows of 2X2 ribbing that drives one nuts.



I did get my new 16inch size 3 needles Thursday, and have done 2 repeats of the Venezia sleeve pattern since then. I think the longer stripes will work with the body, but I don't think I can get both sleeves to match up.

DH and I went and saw Spamalot Friday night for our anniversary, it was a riot, and not a complete rip off of Monty Python and the Holy Grail. My parents have had C since Friday, and they are due to drop him off any time now. While I loved having a child free day last night, I can't wait to have my little boy in my arms again.

Tuesday, June 19, 2007

Yes, I'm pregnant!

Sorry, had to get that off my chest after knowing for 2 weeks. So far, I'm feeling good, really tired, but no MS yet (knock on wood). Right now we are looking at a EDD of mid February.

I haven't really felt much like knitting lately, but I've been getting a little done.

I finished Rusted Root, but I haven't got any photos yet. I need to "wash and block", but since it is knit in cotton ease, I figure running it through the washer and dryer will be good enough. I did modify the the pattern a bit by leaving out the waist shaping, that way I would be able to wear it a little bit this summer, but I don't know how long.

I have done a bit more on Venezia, but I had too many stitches to do DPN's right, and way too few to use my one size 3 circ needle (even with magic loop), so I'm waiting on a 16inch needle to come in from KP before I do much more. I have lost steam on this sweater knowing that I won't be able to wear it this winter,

I did start my Mommy Snug, from the Summer 06 Interweave Knits. I'm using more yarn from stash, Cotton Ease in Popsicle blue, and I am pretty close to gauge, but not 100%. I figure since it is a maternity sweater in ribbing, the extra bit of room won't be too bad. I cast on Sunday and have 50 rows done already, so this looks like it will be a faster knit than I thought it would be.

I'm still waiting for the start of the Mystery Stole 3 knit along, which will be next Friday. I need to get back in the lace mode. I haven't finished a lace project since April.

I'm also looking forward to Friday night when DH and I are going to see Spamalot. The tickets were our anniversary present to each other for 5 beautiful years together.

Sunday, June 10, 2007

Finally, a week for knititng.

After taking a week's break from Venezia, and with many stupid mistakes that shall not be repeated, I have finally started the first sleeve! I decided to save my sanity and not P2tog the hem, but will slow it down when I am finished knitting. There isn't much to see yet, but it will look better in the next photo.


I have been working mostly on Rusted Root this week. I have finished the ribbing on the neck and the sleeves, and only have the rest of the body to finish. I think I have three repeats to finish until the bottom ribbing, and I may have it done by the end of next weekend.

The Alpine Knit Scarf has once again, regrettably, been sent to the Frog Pond. Not for any mistakes with the pattern, but because I hadn't touched it in two weeks, since we were waiting to see Pirates 3, and I needed the yarn for something better.
The Mystery Shall 3 was announced this week, which I signed up or, and the called for colors are either white or black. Midnight Heather Alpaca Cloud would be perfect. I went out and found beads, and bought a small enough hook. It can been seen here, since I accidentally deleted the picture and don't know how to re-upload it with out having to start the whole post over
Cast on is at the end of the month.


I have one other project that I am excited to start, but not ready to blog about yet. I think the photo will give a hint: The yarn has been in my stash for the last two years, since Cotton Ease was first discontinued, and I bought enough of a dye lot to make a sweater, which has been abandoned. I think I have enough yarn for my size, but I'm not 100% sure.

Tuesday, June 05, 2007

Knitting under the influence.

Yeah, not a good idea.

I had to frog the first sleeve of Venezia twice, and many times over on the color work.

I missed 10 stitches when I cast on, and it really threw off the color work.

Venezia is in time out for the rest of the week.

Rusted Root has come out to play this week, with a little bit of Alpine Lace, but I really haven't done much knitting this week.

I have been working on setting up my Ravelry account and reading the new Anita Blake book.

Did I mention I now have a Ravelry account? Its so cool!

Saturday, May 26, 2007

Black Lace and a Dark Movie Theatre Don't Mix.

DH and I took off early yesterday to go see Pirates 3 while C was still at daycare. Thinking we were going to stop off at home before heading up, I didn't bring one of my main knitting projects with me to work on before the show.
DH had other plans, and we went from work to Wendy's and straight to the Cinamark.
He had the Harry Potter books with him on his PDA to read, and he told me to go ahead and knit something.
The only thing I had with me was the Alpine Knit Scarf, which is on size 2 needles, in black lace weight. While we were standing outside the theater in the light, it was fine to knit, and I got a good 3 rows done. After we were seated, it was a different matter. They had the lights turned to the almost off, and hadn't started playing the onscreen pre-movie adds that theatres play now.
I managed to wedge myself in the seat so I at least had the white screen as in front of me without holding my knitting up to my eye level at all times, and got another two rows knit.

The movie ROCKED! Both DH and I left the theatre saying we HAD to go back and see it again after we got paid, (Or Monday and put it on the CC, and its been a long time since we felt that way after seeing a movie.

I'm still podding away on all three knits, and looking ahead to what is next.

Next lace will be the Peacock Feathers Shawl, again, but this time for me, in KP's Alpaca Cloud Tide pool, but I need to finish both The Alpine Knit Scarf and Venezia, since I currently have my size 3 cir busy with that.

Next Fair Isle will be the Bauhaus Fair Isle from the Spring 2007 IWK (Unless Eunny publishes another amazing pattern before then). I've been looking at Subs, and I think Knit Picks Telemark will work best, but it leaves me pondering. If KP Telemark is a sport weight yarn at 103 Yards per 50 grams, why does KP WOTA, a worsted weight have 110 yards? But it looks like the Telemark knits up to the same gauge as the called for Heilo, at $3 less per skein.

Next "Anytime" sweater will either be Wicked or maybe Saharah or the Simple Knitted Bodice, or any of a thousand projects that will come across my eyes between now and then.

*ETA*- Black Lace, Work, surfing Bloglines while knitting the row where the pattern changes don't mix either. I lost count completely after I read about Glampyre's good news. Since I don't have a Word Press Account, and can't commit on her blog, I wanted to say CONGRATS! here.

Tuesday, May 22, 2007

I've Been a Bad Blogger Lately.

Not only am I not updating the blog as often as I would like to, when I do its at work and without any photos.
Since I broke the screen on my laptop, and have to use a monitor screen, its just not as easy to get on the computer at home, and now I find that C has taken the cable that allows me to download photos and hid it somewhere.

Saturday I did a lot of knitting on Venezia. I started the arm steeks, and am almost done doing the decrees rows there, then I have 48 rows without any increases or decreases before I start the neck. I think I might be able to have the body done in a few weeks.

Sunday I finished Leaf while watching the Ninja Warrior marathon on G4. I do have some cruddy bathroom photos to post as soon as I can. I sucked it up and did the i-cord edging around the body, and except for a few spots where I missed a pick up stitch, it looks pretty decent.

I then cast on for Rusted Root in some old Cotton Ease that has been in the stash for 2 years. While I love how the knitted fabric feels, I forgot what a number the cotton ease can do on your hands. I think this is going to be a slow knit for the most part, but that's ok with me.

C has been sick all weekend, I stayed home with him yesterday, and DH is home with him today. Since C has gotten worse last night/this morning, DH is taking him in to the Doc's in about an hour.

I finally got a chance to look through the Summer Interweave Knits, and it just reaffirmed that this is one issue I won't be buying. The few things that looked like I might knit didn't look as good to me in print.

Sunday, May 13, 2007

Happy Mothers Day

To all the Mothers and Mom's to be out there!

My Mothers day present was a day to myself yesterday, of which I spent a large chunk of time knitting on Leaf. The body is finished, and I am working away on the Sleeves. I think it might be possible to have a FO on this by the end of next weekend.

I did some knitting on Venezia today while we were at my mothers.

I am about half way done with the fourth chart repeat, and about 23 rows away from starting the steeks for the arms, again, I am thinking by next weekend.

I did break my "No more than two at a time" rule and re-cast on for the Alpine Lace Scarf last night. This time I am working on the size 2 Knit Pick options that I bought last month, and the P2tog's are going a lot smoother.
DH also bought me the pattern for Rusted Root, which I am planning on knitting with some Cotton Ease that has been in the stash for over two years, when I bought up tons at half price.